e-able

Commercial

Chillers and data centres that run cleaner.

For chilled-water plant and data-centre cooling first, then offices, hotels, restaurants and heating systems. As described by GRANDER: less limescale and corrosion, more efficient cooling and boiler systems, and less maintenance.

We start where the load is largest, on the cooling circuit, and measure on your own meters before you commit further.

Where we start

Chillers and data centres.

Cooling is often a building's biggest energy and water load. A GRANDER Circulation Revitalisation Device goes on the chilled-water or cooling circuit, with no power and no dosing.

GRANDER circulation unit, red label
Chilled-water plant

Chillers & cooling circuits

Circulation Revitalisation Devices on closed chilled-water loops and condenser circuits. According to GRANDER, for cooling systems this means reduced maintenance and optimised chemical use. Position is set after an on-site inspection.

Learn more
Data centres

Data-centre cooling, measured.

At a Hong Kong data centre: about 14% less cooling energy, about 28% less water and HK$399,134.50 a year in estimated savings. Two cooling towers and three chillers, measured on the site's own meters. Preliminary, site-specific results.

See the case study

Measured, not promised

Results on your own meters.

We set a baseline first, then compare like for like, weather-adjusted where it matters.

The same months, a year apart. The site's own meters. A written report with the method shown, so your engineers can check every figure.

−14.1%Weather-adjusted cooling energy
(61,288 kWh)
−27.9%Water use
(1,864 m³)
HK$399kEstimated savings a year
(HK$399,134.50)

Hong Kong data centre, Phase 1 cooling, Jul–Sep 2025 vs 2026. Preliminary, site-specific results; outcomes vary by site. The client is not named.

Also for offices and hotels

Air-conditioning is the biggest load.

Climate Action Plan 2050 targets a 15–20% cut in commercial-building electricity by 2035.

Every efficiency gain in a building's cooling system counts towards that target. A measured pilot on one circuit shows owners what is possible on their own building.

Heating circuit with the circulation unit on the return after a dirt separator, and a cooling circuit where the position is set on site

Hotels, restaurants and larger buildings

According to GRANDER, Water Revitalisation Devices are used on the main water supply of hotels, restaurants and larger buildings, in main pipe sizes ¾″ up to 4″. GRANDER states that laundry and cleaning products can be reduced and that less maintenance saves time.

How a project runs

Install. Flow. Transfer. Measure.

Four steps: install, flow, according to GRANDER information transfer, measure
GRANDER circulation unit and inline unit

The unit

Circulation Revitalisation Device.

Fitted into closed heating, chilled-water and process circuits. No power, no dosing, nothing to replace.

  • Sizes ⅜″ to 4″
  • V2A stainless steel; V4A on request (¾″ up)
  • Red-brass nipple connections
  • Not for drinking water

Per the GRANDER catalogue.

Pilot one circuit.

Begin with one circuit or one building, measure, then roll out.

We survey, install on a single loop and report against your baseline before you commit further. Email us the building address, the type of system and a convenient time for a site visit.

Book a site surveyEmail