Industrial
Process water without the chemistry.
For closed heating and cooling circuits and process water lines. No power, no additives, and every result measured on site.
GRANDER Circulation Revitalisation Devices go on heating, cooling and process circuits. Water Revitalisation Devices go on the main supply of industrial plants. We start with one circuit, measure on your meters and scale from there.
On the loop
One unit on the circuit.
A Circulation Revitalisation Device sits in the closed loop between the plant and the consumers. Water passes through in normal operation, and the device sits in the pipework like any other fitting.

Installation notes, according to GRANDER
- Heating circuitsOn the return flow, after a dirt separator, on a vertical pipe.
- Cooling and process circuitsPosition set after an on-site inspection.
- 3″ and 4″ devicesAlways on a support bracket.
Key facts
Simple to specify.
As described by GRANDER: less limescale and corrosion in the system, and lower maintenance over time.
Key facts, per the GRANDER catalogue
- Sizes ⅜″ to 4″
- V2A stainless steel; V4A on request (¾″ up)
- Red-brass nipple connections
- No electricity, no additives
- Industrial use only, not for drinking water


Industrial benefits, as described by GRANDER
- Savings on chemicals and water in cleaning and purifying
- Fewer maintenance cycles and lower operating costs
- Less limescale, algae and sludge build-up
- Less corrosion and rust formation
- Higher efficiency of cooling and boiler systems
- More stable water in cooling, heating and process circuits
- Less production downtime
Where conventional water treatment is required, GRANDER can support it but not replace it. Results vary by site and are measured on your own meters.
Beyond the circuit
Main supply for industrial plants.
- Water Revitalisation DevicesFor the main water supply of industrial plants, main pipe ¾″ up to 4″. No electricity, no additives.
- What GRANDER statesSavings on chemicals and water in cleaning and purifying, fewer maintenance cycles and higher efficiency of cooling and boiler systems.
Our service
Survey, install, monitor, support.
Each stage has a named owner at e-able and a clear output for your engineering team.
- Survey
We visit the site and review the water system: circuits, pipe sizes, separators and access.
Recommendation & quotation - Install
Licensed contractors fit the unit, with permissions arranged first.
Installation record & hand-over - Monitor
Results tracked against a baseline on your own meters.
Results report - Support
A dedicated contact, from survey to hand-over and beyond.
Ongoing reviews
Start with one circuit.
We review your system, fit a single device and report the results on your own meters. Email us the plant address, the circuit you want to start with and a convenient time for a site visit.
