Proof
A Hong Kong data centre, measured.
GRANDER Circulation Revitalisation Devices on the cooling and chilled-water circuits of a Hong Kong data centre. Before and after, on the site's own meters.
This page shows exactly how we measured, what we adjusted for and where the figures are limited. Engineers and finance teams can check every step.
Preliminary, site-specific results.
Preliminary, site-specific results. Results vary by site, system and operation. The client is not named.
The site
A cooling system, measured on its own meters.
Phase 1 cooling at a Hong Kong data centre: two cooling towers and three chillers. Energy and water were read from the site's own meters, then compared with the same three months a year later.
We chose a like-for-like window on purpose. Comparing the same months removes most seasonal differences, and the weather adjustment below deals with the rest.
- Site
- Data centre, Hong Kong
- System
- Phase 1 cooling: two cooling towers, three chillers
- Installed
- GRANDER Circulation Revitalisation Devices on the cooling and chilled-water circuits
- Period
- July–September 2025 vs July–September 2026
- Method
- Site meters. Energy weather-adjusted with CDD18.

How it was measured
Baseline. Install. Compare.
The same three months, a year apart. Energy was adjusted for weather. Water was compared as metered.
- Baseline
July–September 2025 cooling energy and water use, read from the site's own meters.
- Install
Circulation Revitalisation Devices fitted on the cooling circuits by licensed contractors. No power, no dosing.
- Compare
July–September 2026, with energy adjusted for cooling degree days (CDD18, 18 °C base, Hong Kong Airport).
According to GRANDER, a sealed core revitalises the water flowing past it. A GRANDER unit is not a filter and removes nothing from the water.
Weather adjustment
Cooler weather was taken out of the energy figure.
A cooler summer means chillers work less, so a raw comparison would overstate the saving. We therefore adjusted energy for cooling degree days.
2026 had about 2.1% fewer cooling degree days (1,084.50 down to 1,061.80). Unadjusted energy was 15.93% lower. Of that raw reduction, about 9,269 kWh is accounted for by cooler weather. The weather-adjusted reduction is 61,288 kWh, about 14.1%. That is the figure we report.
From the raw reduction
70,557 kWh lower energy, before weather is taken out.
The results
Before and after, side by side.
Energy, energy per cooling degree day, and water: July–September 2025 against the same months in 2026.
Weather-adjusted cooling energy fell about 14%. Water use fell about 28%.
Jul–Sep 2025Jul–Sep 2026
Energy consumption
kWh, Jul–Sep · unadjusted
−70,557 kWh · −15.93%
Energy per CDD18
kWh per cooling degree day · weather-normalised
−14.14%
Water consumption
m³, Jul–Sep · unadjusted
−1,864 m³ · −27.87%
Weather-adjusted energy reduction 61,288 kWh, about 14.1%. About 9,269 kWh of the raw 70,557 kWh reduction is explained by cooler weather. Water is an unadjusted comparison. CDD18 uses an 18 °C base at Hong Kong Airport. Preliminary, site-specific results.
Cost
Three months, then a year.
Electricity valued at HK$1.40/kWh on the weather-adjusted 61,288 kWh. Water valued at about HK$7.50/m³ on 1,864 m³. The annual figure is the three-month saving times four.
We show the rates so you can re-run the sums with your own tariffs.
HK$99,783.63 over three months. HK$399,134.50 a year, annualised.
ElectricityWater
Annualised = three-month saving × 4, and assumes similar savings in every quarter. Preliminary, site-specific results.
The breakdown
| Component | Three months | Annualised (×4) |
|---|---|---|
| Electricity | HK$85,803.63 | HK$343,214.50 |
| Water | HK$13,980.00 | HK$55,920.00 |
| Combined | HK$99,783.63 | HK$399,134.50 |
Installation HK$1,916,000. Rates used for this study: HK$1.40/kWh and about HK$7.50/m³.
Payback
About 4.8 years, before recurring costs.
Cumulative savings at HK$399,134.50 a year, set against an indicative installation of HK$1,916,000. Simple payback, with no escalation or discounting.
This is a deliberately simple view. Your own figure depends on your tariffs, your system and how the plant is operated.
Indicative simple payback of 4.8 years.
Cumulative savingsInstallation HK$1,916,000
Simple payback = HK$1,916,000 ÷ HK$399,134.50 a year. Excludes recurring servicing and other costs, financing and taxes. Annual savings are annualised (×4) from one three-month period at one site. Preliminary and site-specific.
Carbon
About 98 tonnes of CO2 a year, annualised.
From the weather-adjusted energy saving, at 0.4 kg CO2e/kWh. The annual figure is the three-month saving times four.
About 24.5 tonnes over three months. About 98.1 tonnes a year, annualised.
Weather-adjusted 61,288 kWh over Jul–Sep, annualised × 4 = about 245,150 kWh, at 0.4 kg CO2e/kWh. Preliminary, site-specific results.
Limits of this study
Preliminary, site-specific results.
Measure it on your own site.
We start with one circuit, set a baseline on your meters and report the results before you commit further. Email us the site address and the system you would like to measure.